ClimatearXiv
Reviewed by rulesVerdict: NotableProbabilistic Power Estimation and MPC-based Scheduling of Construction Electric Vehicles Supported by Mobile Charging Stations
The adoption of construction electric vehicles (CEVs) is held back by sparse on-site charging infrastructure, limited mobility, and insufficient knowledge of their power consumption.
Key numbers
- 60.2% relative to the open-loop
- 23.3% relative to CE-MPC
Caveats
- Preprint; not yet peer reviewed.
VerdictWorth a reader's time today.
Abstract
The adoption of construction electric vehicles (CEVs) is held back by sparse on-site charging infrastructure, limited mobility, and insufficient knowledge of their power consumption. Mobile charging stations (MCSs) towed between grid connection points and construction sites address the first barrier, yet scheduling them optimally requires an accurate estimate of the CEV power consumption. In this paper, we address these gaps, first, by estimating the power of each subactivity of a representative CEV (a compact electric excavator) based on real-world construction demonstration data. We use Bayesian linear regression to obtain the subactivity power distributions, accounting for their operational uncertainty. Second, we formulate a mixed-integer program that jointly schedules CEV work and charging together with MCS routing, charging, and discharging, optimizing electricity costs, carbon emissions, work completion, and MCS travel. We embed the optimizer in a shrinking-horizon model predictive control (MPC) loop to perform real-time control on the CEV-MCS system. Two MPC variants, one a certainty-equivalent MPC (CE-MPC) controller, and the other a scenario-based MPC (SB-MPC) controller, are compared in closed-loop against an open-loop day-ahead schedule. Realistic simulations show that SB-MPC performs the best, lowering the operating costs by 60.2% relative to the open-loop baseline, and by 23.3% relative to CE-MPC, demonstrating the efficacy of incorporating predictive control with feedback. The code is available at https://github.com/Shubhanflash22/CEV-MCS-MPC-Joint-Scheduling
The editor's rubric
- Leverage3 / 5
- A method or resource many groups across the field will adopt within a year.
- Magnitude3 / 5
- Large gain: roughly 2x, or a clear new state of the art on a hard, unsaturated problem.
- Evidence3 / 5
- Solid: multiple benchmarks or cohorts, ablations, fair baselines, released code or data.
- Novelty2 / 5
- A new combination of known ideas.
- Trajectory2 / 5
- Some room to improve with obvious engineering.
- Stakes3 / 5
- Meaningful benefit to many people within a few years.
Editor’s rationale
Heuristic triage from title and abstract text only, not a reading of the paper. Cues found: gains (relative gain); verification (error bars, code released); stakes (energy, climate).
How the score was computed
Desks place stronger verdicts first, then use this score to order work within the same verdict.
- Merit
- 5.5 / 10
- Adjusted merit
- 4.6 / 10
- Attention
- 0%
- Freshness
- 49%
- Citations0 (reference 15, via semantic-scholar, Nov 26, 2026, 06:45 UTC)